 This letter is to confirm that the 10.8 kw Atrax™  PV system supplied by Copperhill Alternate Energy Inc. meets or exceeds the microFIT / FIT program requirements. We are pleased to have the Ontario Government strongly supporting Ontario suppliers and manufacturers in the microFIT / FIT program. By requiring a percentage of Ontario manufactured components,  Copperhill and Atrax are able to create dozens of new local jobs.

 The Green Energy and Green Economy Act of 2009 officially started the microFIT /FIT program on October 1, 2009.

 

Until December 31, 2010, systems installed under the micro FIT program must have a minimum of 40% Ontario content. The Ontario content requirement in the FIT program is 50%. As of January 1, 2011 all systems must have a minimum of 60% Ontario content.

 Copperhill meets this requirement with a score of 46% in our 10kw tracking system without sacrificing quality in our system. We continue to use the SMA inverter, ATRAX™ solar tracker, offer free web based system monitoring, and consumer choice of solar panels along with a full 20 year warranty.  Please see the chart below for more detail.

 Thank you for choosing our system. Feel free to contact us with any questions or comments.

 Sincerely,

 John Verway,

President

 

Designated Activity

Copperhill

ATRAX 10kw

Tracker

Qualifying
Percentage

1.

Silicon that has been used as input to solar photovoltaic cells manufactured in an Ontario refinery.

na

10%

2.

Silicon ingots and wafer, where silicon ingots have been cast in Ontario and wafers have been cut from the casting by a saw in Ontario.

na

12%

3.

The crystalline silicon solar photovoltaic cells, where their active photovoltaic layer(s) have been formed in Ontario.

na

10%

4.

Solar photovoltaic modules (i.e. panels), where the electrical connections between the solar cells have been made in Ontario, and the solar photovoltaic module materials have been encapsulated in Ontario

na

13%

5.

Inverter, where the assembly, final wiring and testing has been done in Ontario.

na

9%

6.

Mounting systems, where the structural components of the fixed or moving mounting systems, have been entirely machined or formed or cast in Ontario. The metal for the structural components may not have been pre-machined outside Ontario other than peeling/roughing of the part for quality control purposes when it left the smelter or forge. The machining and assembly of the mounting system must entirely take place in Ontario (i.e. bending, welding, piercing, and bolting).

 

 

 

 

 

9%

9%

7.

Wiring and electrical hardware that is not part of other designated activities (i.e., items 1, 2, 3, and 5 of this table), sourced from an Ontario supplier.

 

10%

10%

8.

All on- and off-site labour and services. For greater certainty, this designated activity shall apply in respect of all contract facilities.

 

27%

27%

Total

46%

100%


Please login to comment

Comments (2680)

  • just click the following page May 21, 2013
    just click the following page... Frequently Asked Questions About Solar...
  • just click the following web site May 21, 2013
    just click the following web site... Frequently Asked Questions About Solar...
  • Haley May 21, 2013
    Haley... Frequently Asked Questions About Solar...
  • mali music new song May 20, 2013
    mali music new song... Frequently Asked Questions About Solar...
  • Retha May 20, 2013
    Retha... Frequently Asked Questions About Solar...
  • please click for source May 20, 2013
    please click for source... Frequently Asked Questions About Solar...
  • sacs louis vuitton May 20, 2013
    sacs louis vuitton... Frequently Asked Questions About Solar...
  • Efficient kitchen May 20, 2013
    Efficient kitchen... Frequently Asked Questions About Solar...
  • bestuff.com May 20, 2013
    bestuff.com... Frequently Asked Questions About Solar...
  • Steve May 20, 2013
    Steve... Frequently Asked Questions About Solar...
  • RAY BAN SUNGLASSES SALE May 20, 2013
    RAY BAN SUNGLASSES SALE... Frequently Asked Questions About Solar...
  • nike air max skyline mens May 20, 2013
    nike air max skyline mens... Frequently Asked Questions About Solar...
  • Visit May 20, 2013
    Visit... Frequently Asked Questions About Solar...
  • Read More Here May 20, 2013
    Read More Here... Frequently Asked Questions About Solar...
  • visit our website May 20, 2013
    visit our website... Frequently Asked Questions About Solar...
  • casino bonus slot machines May 20, 2013
    casino bonus slot machines... Frequently Asked Questions About Solar...
  • casino Bonuses 100 no deposit 2013 May 20, 2013
    casino Bonuses 100 no deposit 2013... Frequently Asked Questions About Solar...
  • Melaine May 20, 2013
    Melaine... Frequently Asked Questions About Solar...
  • CHEAP LOUIS VUITTON BAGS May 20, 2013
    CHEAP LOUIS VUITTON BAGS... Frequently Asked Questions About Solar...
  • na tej stronie May 20, 2013
    na tej stronie... Frequently Asked Questions About Solar...

ATRAX Newsletter

Sun Scope Newsletter
Please send me a Copperhill Information Package


Receive HTML?


You are here: Home FAQ's MicroFIT Ontario Content Requirements - Letter From Copperhill